← Luna Library

Compliance folder

Compliance

The compliance work separates official sources, the provisional legal reading, authority questions, operational stop rules, and evidence that does not yet exist.

ENAC report prepared · not yet digitally signed or filed · no protocol or reply claimed

Current status

A prepared request, three residual points.

The request is prepared for digital signature and PEC dispatch. Signature, dispatch, delivery, protocol and reply remain distinct, recorded against actual evidence. This public section explains the known legal framework, the outstanding conditions and the three residual questions; it does not claim a filing or authorisation.

Regulatory resources

Read the source-backed EU, national, ENAC, and Liguria map and its provisional classification analysis.

Open resources

ENAC questions

Review the residual questions, the answers already available, and the truthful communication status.

Open the register

Other authorities

Understand which national, regional, local, safety, and product-compliance channels may require a separate check.

Open the map

Operational stop rule

Apply the rules to the actual site.

The absence of an ENAC reply is not itself a blanket ban on every outdoor activity. Apply the published airspace rules and complete the actual site, lighting and safety checks. Operations above gatherings require a separate assessment; the internal core below 250 g does not establish that they are allowed.