Skill BIM · The numbered workflow
Every number. All its contributions.
Ten decades organise the workflow. Each number opens one shared page, bringing together the relevant technical, visual and legal contributions.
03 / Connected expertise
Different disciplines. Shared intelligence.
Browse the ten decades horizontally. Choose a decade to explore its numbered agents, with technical, visual and legal contributions together.
Proposed organisation · the numbered catalogue follows the latest reorganisation plan. Contributions are planned; this view does not confirm operational activation.
00–09 · Choose a decade
Existing building
From historical sources and measurements to a documented existing-state model.
Our homes · this decade’s work
From method to a real home.
Views to prepare
- Measured existing building
- Documented reconstruction
Only models of our own homes, with clear revision and deliverable status. Generic examples do not substitute for the real work.
Explore the current 3D snapshotsCase-study objectives- 10Existing-building coordination
Coordinate historical plans, measured evidence and reconstruction of the existing building.
EC10MG10 - 11Point cloud to building model
Turn measured points into identifiable building elements useful for the design.
EC11 - 12Historical plan acquisition
Recover useful spatial information from old drawings while preserving their limits.
EC12 - 13Measured existing-state plans
Produce a coherent current-state plan from accepted measurements and source drawings.
EC13 - 14Existing-building model completion
Complete and verify the existing geometry needed for the commissioned design and documentation.
EC14 - 15Measured outdoor spaces
Document gardens, courtyards, paths and road frontage within the commissioned survey.
EC15 - 18Geospatial context
Connect measured building geometry to a documented spatial frame and relevant territorial evidence.
EC18MG18MW18L18
From method to evidence
