Existing building

10Existing-building coordination

Coordinate historical plans, measured evidence and reconstruction of the existing building.

Proposed organisation · the numbered catalogue follows the latest reorganisation plan. Contributions are planned; this view does not confirm operational activation.

One stage, complementary contributions.Back to the decades

Contributing to the stage

Expertise working together.

Each role retains its own objective and deliverables. Open the details to read how it contributes to this stage.

EC10Planned contribution

Existing-building coordination

Coordinate historical plans, measured evidence and reconstruction of the existing building.

Method and deliverables

How it contributes

Coordinate historical plans, measured evidence and reconstruction of the existing building.

Expected deliverables

Deliverables are not yet specified in the public catalogue.

MG10Planned contribution

Blank measured floor plans

Provide clear model-derived blank plans for independent layout sketches.

Method and deliverables

How it contributes

Derives the drawings directly from the existing-state model, retaining entrances, stairs, steps and level changes. Omits only partitions already confirmed as removable; uncertain fabric remains. Shows floor-to-ceiling heights excluding beams, with beam-limited headroom kept separate and unresolved heights identified.

Expected deliverables

  1. Model-derived blank measured plans
  2. Entrances, level changes and qualified height notes

“Registered” describes the role in the catalogue. Deliverable availability and project status are verified separately.