Current property · community base

Casa del Forno

The current practical base of the community: three registered residential subunits and an ancillary building associated with the historic oven, all still requiring phased assessment and works.

Casa del Forno

The future design

A house to explore.

A design to explore by space and level, after the models have been completed and reviewed.

Casa del FornoIn preparation
Explore the design here, once ready.

The model, plans and renders are not published yet. Views will open after completion, review and authorisation.

House → unit → floorFuture exploration
Plans and verification

The future design remains separate from the actual building. This section does not certify completed works, areas, occupancy or availability.

Architecture and building services will be coordinated with survey evidence and technical checks. Specific solutions still need to be designed.

A free view or a camera sequence is different from a verified walk: navigation through the spaces will require dedicated checks.

Technical method and objectives · Skill BIM

At a glance

Verified facts, without turning them into promises.

The stated areas are total cadastral areas. They do not automatically equal net, usable, habitable, or available area.

239 m²combined total cadastral area · residential subunits
3registered A/4 residential subunits
52 m²total cadastral area · C/2 ancillary building
0rooms open for booking

Historic street numbers and coordinates are not consistent across all sources. We use Strada Chiappella and a verifiable map link without assigning an unreconciled house number to an individual property.

Documented composition

A historic plan is not a room inventory.

The three residential records report total cadastral areas of 96, 79, and 64 m². The public plan is a historical cadastral preview, not a current room inventory, capacity statement, or certificate of usable area.

Casa del Forno Sub. 5 historical plan preview
Sub. 5Sanitised historical preview · not for construction measurements
Casa del Forno Sub. 6 historical plan preview
Sub. 6Sanitised historical preview · not for construction measurements
Casa del Forno Sub. 7 historical plan preview
Sub. 7Sanitised historical preview · not for construction measurements

Restoration status

Every phase states what is known today.

01ACTIVE · PHASE 01

Survey and current-use assessment

The community uses parts of the complex while surveys, safety priorities, removable elements, and evidence needs are organised.

02HISTORICAL BACKLOG · REVALIDATE

Electrical, bathroom, drainage, heating, moisture, and finishes

Earlier plans identify these themes, but they remain a backlog to be rechecked rather than completed or authorised work.

03NOT YET PUBLISHED

Formal technical work packages

No Casa del Forno dossier equivalent to the current Casa del Noce package is published yet.

04BOOKINGS CLOSED

Room-by-room readiness

Capacity, room categories, prices, and availability will appear only after property, technical, and operating reconciliation.

Real media

Project photographs and the restoration diary.

Photographs from the project archive, with author and context. Restoration status and room availability follow their own updates. Reels are published by ColivingLiguria.

Room in Casa del Forno with stone walls, exposed beams, a sofa and a wooden wardrobe.
One of the shared rooms in Casa del Forno, documented as part of the restoration project.Photography · Golnoosh Shahidi

Close-up context

Its relationship with the other houses, seen from above.

The satellite view is for orientation within the Strada Chiappella context only. It is not a cadastral boundary, technical survey, or exact meeting point.

Location and arrival

Public documents

No formal technical dossier published yet.

We do not publish extracts, deeds, raw cadastral plans, or old backlogs as if they were a current dossier.

Package in preparation

This section will be updated when documents explicitly approved for public consultation exist.

Visits and availability

Bookings closed. Visits only by prior agreement.

The private area records interest and the intended route. Do not send personal documents through public pages and do not arrive without confirmation of the meeting point.