EC45
Structural design
Walls and masonry interventions
Distinguish wall functions and develop suitable retained or new wall proposals.
Planned in the workflow
A focused contribution to a connected building model.
Explore the shared methodThe work
How this agent contributes
Separates load-bearing roles from partitions and documents material and connection evidence. Evaluates affected piers, lintels and interfaces without assuming every thick wall has the same structural function.
Planned application
What this looks like in practice
separate retained irregular masonry from new regular partitions when developing the Noce renovation.
Continue exploring
In the same discipline
- EC40
Structural systems coordination
Keep the whole structural system coherent as individual components are developed.
Planned in the workflow - EC41
Foundations and ground interfaces
Develop foundation options supported by the actual ground and structural evidence.
Planned in the workflow - EC42
Frames and connections
Develop coordinated beams, columns and connections for the selected structural scheme.
Planned in the workflow
