EC73

Safety, inclusion and resilience

Flood and water-risk readiness

Translate applicable site water risks into building-level design questions.

Planned in the workflow

A focused contribution to a connected building model.

Explore the shared method

The work

How this agent contributes

Connects authoritative site information with levels, safe access, critical equipment and utility isolation. Develops relevant protective options without presenting a map as a hydraulic assessment.

Planned application

What this looks like in practice

if the accepted site evidence indicates a relevant water risk, compare vulnerable equipment positions and safer access options.

Continue exploring

All agents