EC21
Existing building
Existing-building model completion
Complete and verify the existing geometry needed for the commissioned design and documentation.
Planned in the workflow
A focused contribution to a connected building model.
Explore the shared methodThe work
How this agent contributes
Connects plans, measured heights and targeted checks into a consistent three-dimensional model. Requests missing controls where a hidden face, level or thickness affects the intended work.
Planned application
What this looks like in practice
reconcile the Forno split levels and retained supports needed for its replacement-floor design.
Continue exploring
