Land and outdoor spaces

Current property · future community-garden concept

Casa del Noce garden

The large garden in front of Casa del Noce is the principal future shared outdoor room: a place for shade, work, long tables, and seasonal community life. A pool remains a separate, highly conditional technical concept.

1,270 m² · verified cadastral surface

01 · Three layers

Property, current use, future idea.

The three facts remain separate: owning land does not automatically make a service available, and a concept is not an authorised project.

01Current perimeter

Property

Parcel 522 belongs to the acquired property record and is connected to Casa del Noce. Its 1,270 m² cadastral surface is not the same as net usable, buildable, event, or pool area.

02Today

Current use

  • The garden forms part of the current property context, while no pool, gazebo, outdoor office, event capacity, or commercial service is approved or bookable.
  • The current public task is to document vegetation, levels, services, access, drainage, and safe usable zones.
03Conditional

Future direction

A shaded community workspace for warm months and shoulder seasons

The remaining ideas and their checks are detailed below.

02 · The real land

Physical character and cadastral record.

Reading the place

What is known, without filling the gaps.

  • The reviewed historical description identifies a large garden with a mature walnut tree and other vegetation.
  • CDU 2025/102 divides the parcel between different planning areas; no simplified buildability claim is made here.
  • The relationship with Casa del Noce is factual; the future layout remains to be surveyed and designed.

Verified data

Sheets, parcels, and surfaces.

  • Sheet 29, parcel 522 · 1,270 m² · arable land, class 2
  • The historical public description records a large garden and mature walnut tree in the Casa del Noce context.
  • The cadastral surface is not an automatic usable-event, pool, or building area.
Casa del Noce context map

Authorised house-orientation link; it is not a parcel or usable-area map.

03 · Work plan

Survey first. Design second.

Every future function enters a verifiable sequence and may be reduced, moved, or excluded if the checks do not support it.

01

Survey trees, shade, levels, access, utilities, drainage, and the planning-zone split.

02

Design a reversible first phase for work, meals, planting, circulation, and maintenance.

03

Treat gazebo, events, audio, and pool as separate projects with independent approvals and operating plans.

Proposed uses

Concepts, not services.

  • A shaded community workspace for warm months and shoulder seasons
  • Long shared tables for meals connected to the Casa del Forno community kitchen and oven
  • A light gazebo or other reversible shade solution, subject to title, structure, distance, and planning checks
  • A possible outdoor-pool concept only after planning, technical, safety, water, drainage, energy, and operating studies
  • Small community activities with capacity and sound managed only after the applicable review

Checks before opening

Conditions that may change the project.

  • Planning-zone split and available title
  • Trees, shade, access, drainage, and utilities
  • Structures, distances, safety, and capacity
  • Pool water, discharge, energy, maintenance, and supervision
Publication boundary

No pool, gazebo, event capacity, outdoor audio system, or commercial garden service is approved, built, or bookable through this page. These are distinct future projects, not current amenities.

Summary sources

Source layer: acquired-property record, historical cadastral extract, CDU 2025/102, and reviewed Casa del Noce exterior notes. Buildability assumptions from legacy studies are not adopted as facts.