Library

EC · EC programmes and projects

ECEach property keeps its own facts.

Manuals guide the method; only identified projects may contain measurements, assumptions, decisions, calculations, approvals, and site records.

Public research edition

Method and status are public; the technical file remains controlled.

These pages do not authorise work and do not replace surveys, calculations, filings, works direction, safety coordination, or professional signatures. Internal PDFs become downloadable only after publication review, restricted-data removal, and entry in the controlled manifest.

Concise public register

Preliminary means non-construction.

Records state the most important boundary and the evidence a qualified person must still produce or approve. No construction date is simulated.

EC-PT-001

Casa del Noce roof project basis

Property: Casa del NoceStatus: Preliminary package in productionManuals: EC-MT-001

Option study and evidence plan only; it is not a permit, tender, construction, or as-built issue.

  • Controlled measured survey and opening-up record
  • Lawful-state, planning, landscape, and permit determination
  • Signed structural, energy, safety, and detailing package
EC-PV-001 · EC-PM-001 · EC-PT-002

Casa del Forno coordinated renovation bases

Property: Casa del FornoStatus: Blocked pending project evidenceManuals: EC-MV-001 · EC-MM-001 · EC-MT-001

Ground floor, masonry, and roof work remain separate packages until one survey and interface register can coordinate them.

  • Survey datum, levels, room and element coding
  • Moisture, drainage, masonry, floor, and roof condition records
  • Owner decisions, professional appointments, and permit strategy
EC Cairo programme

Cairo Montenotte renovation and expansion decision programme

Property: Cairo Montenotte portfolioStatus: Research brief; entitlement unverifiedManuals: EC-MM-001 · EC-MV-001 · EC-MS-001 · EC-MT-001

The client desiderata guide option research, but the 20% hypothesis and cellar conversion are not treated as acquired rights.

  • Complete lawful-state and planning record for each property
  • Measured geometry, current use, constraints, and title chain
  • Municipal and appointed-professional confirmation of each route