ColivingLiguria Business

FESR Liguria · 2.1.1 · Fifth call

Lower energy use. Better public services.

A grant to make public buildings more efficient, comfortable and economical to operate. A guide for municipalities, public officials and professionals.

Official timetable

Applications 10–24 November 2026 · preparation from 4 November

Sources checked on 4 November 2026

Applicants

Is it suitable for your municipality?

Ligurian municipalities with up to 40,000 inhabitants may apply. Those below 2,000 inhabitants or in recognised SNAI inner areas benefit from a higher grant rate and a lower investment threshold.

See the official inner areas

Start with the building

The call concerns existing public buildings with non-residential public use and access without payment. Ownership or availability, use and planning conditions must be documented for each property.

Examples to assess include municipal offices, libraries and civic spaces. A building’s label alone does not establish eligibility.

Other bodies and special cases

Eligible bodies also include provinces, the Metropolitan City of Genoa, regional agencies, regional public personal-service bodies, port authorities, park authorities and chambers of commerce. For buildings to be brought back into use, the requirements and declarations in sections 4.6 and 9.6 must be assessed together.

The work

A building that wastes less.

Envelope and windows

Wall and roof insulation, window replacement and solar shading to reduce heat loss and overheating.

More efficient systems

Upgrades to heating systems, heat distribution and controls, lighting and building automation. Gas-fuelled systems are excluded.

Renewable energy

Self-consumption systems, including solar PV, within the specific 20% limit on the eligible gross works, systems and supplies base, including safety costs and VAT.

The result must be measurable

For each building or portion: at least one energy-class improvement and at least 30% global primary-energy savings, demonstrated by the energy documentation. Installing a single system is not sufficient.

Professional fees and limits

Energy audits, energy performance certificates and other relevant costs are covered under their respective categories. Professional fees under item s) are capped at 10% of the defined base; indirect costs at 7% of eligible direct costs. New buildings, extensions and demolition with reconstruction are outside the scope. PV-related roof work cannot be used to finance structural consolidation or restoration through that item.

Non-repayable grant

What does the authority fund?

80%

Up to 80% for municipalities below 2,000 inhabitants or in SNAI areas. Minimum investment: €50,000.

70%

Up to 70% for other eligible applicants. Minimum investment: €150,000.

The fifth call has a €7 million budget. One application per applicant, potentially covering several interventions; maximum grant €1 million. Applications are ranked.

Explore an amount

Theoretical maximum grant€160,000.00
Remaining share of this expenditure€40,000.00

An arithmetic illustration, not an eligibility assessment or a funding promise. The minimum threshold concerns total investment. Excluded costs and other expenditure borne by the authority must be added separately.

From idea to application

Prepare before the deadline.

  1. 01

    Choose the property

    Check title, public use, energy consumption, constraints and the authority’s objectives.

  2. 02

    Develop the project

    Coordinate the certified energy audit, energy performance certificate, technical and economic feasibility design, costs and schedule with the responsible professionals.

  3. 03

    Approve and submit

    The authority approves the project, secures its funding share and submits a complete application through FI.L.S.E. Bandi online. Mandatory attachments cannot be completed after the deadline.

4 November, 10:00Preparation opens

10 November, 08:30Submission opens

24 November, 17:30Submission closes

Italian local time, year 2026. Submission is restricted to the portal’s permitted days. Works and supplies must be awarded by 31 July 2027; completion by the grant deadline and no later than 31 December 2027 (section 4.9).

A pathway to develop together

Turn a building into a useful project.

ColivingLiguria Business can support the authority in organising the dossier and coordinating the technical team. Design, professional responsibility and public decisions remain with their respective appointed parties.

This page is not operated by Regione Liguria or FI.L.S.E. Official acts govern conditions and changes.

Edition and sources

D.D.G. 7542 del 23 ottobre 2026

This guide covers the fifth call. Any future edition will require a new official act and a fresh check of eligibility, amounts and deadlines; no sixth edition is announced here.

Share with a municipality or colleague